Migrating your servers: from one machine, host or country to another

  • Home
  • Guides
  • Migrating your servers: from one machine, host or country to another
Guide

Migrating your servers: from one machine, host or country to another

The methods compared, what the Data Act changes when leaving a cloud, the precautions for changing country and the steps for a migration with no nasty surprises.

Updated on 17 October 2026 · Figures are sourced at the bottom of the page; opinions are those of IT CyberWall.

Three situations

Sooner or later, your servers will have to move: the machine is ageing, the host raises its prices, a client requires its data to stay in its country, or you open a subsidiary abroad. There are three situations:

  • From one server to another, with the same host or on your premises: hardware renewal, more capacity.
  • From one host to another: price, quality of service, leaving a public cloud, changing hypervisor.
  • From one country to another: legal or contractual requirements on where data is located, bringing servers closer to users.

The methods compared

IT CyberWall’s assessment of the three common methods.

MethodPrincipleDowntimeProsCons
Reinstall, then transfer the dataThe server is rebuilt from scratch on the new machine and the data is copied onto it.Variable, often several hoursStarts again from a clean base; the only option between very different physical serversSlow; risk of forgetting a setting; requires good knowledge of the existing setup
Copy the virtual machineThe entire virtual server (system, software, data) is copied and restarted elsewhere.The time of the final copyAn exact replica; simple rollbackVolume to transfer; the target hypervisor must be able to import it
Replicate, then switch overData is synchronised to the target while the old server keeps running, then you switch over.Very shortMinimal downtime, ideal for large volumesMore complex to prepare; must be built for each application

Virtualised servers make migration much simpler, on two conditions: you must be able to export the virtual machines, and the target must be able to import them. There is a standard format for this, OVF, standardised as ISO/IEC 17203:2017 [1], and hypervisors offer import tools: since version 8.2 (April 2024), Proxmox VE, for example, includes a wizard that directly imports VMware ESXi and vCenter virtual machines [2].

Changing host, leaving the cloud

Leaving a public cloud

Outbound traffic is normally charged ($0.09 per GB beyond 100 GB per month at AWS [3]). Since 5 March 2024, AWS has waived these charges for customers leaving AWS for another provider or their own servers; beyond 100 GB per month, you need to request this from AWS support [4].

What the Data Act provides

The European Data Act, applicable since 12 September 2025, governs switching cloud provider [5] [6]:

  • a maximum notice period of two months before the switch begins;
  • a transition period of 30 days at most, which can be extended to seven months if it is technically impossible;
  • at least 30 days after the transition to retrieve your data;
  • switching charges limited to direct costs, then prohibited from 12 January 2027.

Traffic from parallel use (for example during a multi-cloud period) may, however, still be charged at cost [5].

Proprietary services

A « managed » database, a message queue or a cloud-specific function cannot be copied like a server: they must be replaced with an equivalent at the new provider. This is often where most of the work lies.

Changing country

Changing country adds a legal question to the technical one. Within the European Union, personal data moves freely. To send it outside the Union, the GDPR imposes a framework (Chapter V): a country recognised as adequate by the Commission, standard contractual clauses or other appropriate safeguards [7].

Some countries also require certain data to stay on their territory, and your clients may require this by contract. Have the framework validated by your legal adviser: for our part, we choose the host and region that comply with this framework, and we carry out the technical migration.

Finally, think about the details that matter: response times for users who are further away, the timing of the switchover window, IP addresses and domain names to change.

The steps of a successful migration

  1. Take an inventory: servers, software, data flows between them, access rights, licences, hidden dependencies.
  2. Back up and check before touching anything: a full, restorable backup, independent of both the old and the new host.
  3. Choose the method server by server: reinstallation, copy or replication.
  4. Test on a copy: start the migrated server in isolation and check that your software works.
  5. Prepare the switchover: a time window agreed with you, domain names ready, users informed.
  6. Switch over and check, with a rollback possible at any time.
  7. Keep the old server for a few days before shutting it down, then wipe the data properly.

Our advice

Our method: virtualised servers on a hypervisor we master (Proxmox VE, VMware, Virtuozzo or Hyper-V depending on the host or your choice), so that your servers can always be moved, and a WeDoBack backup as the foundation of every migration.

  • An encrypted backup, independent of both the old and the new host, which can be restored to the new infrastructure.
  • A safety net: WeDoBack recovery servers keep the business running if the switchover takes longer than planned.
  • Tailored synchronisation for very large volumes: continuous replication between the source server and the target is not automatic; it is built around your applications, on quotation.
  • A single point of contact for inventory, testing, switchover and operations after migration.

To choose the destination, see also our hosting comparison and our backup guide.

A server cannot be migrated yet because old software depends on it? Read our guide obsolete systems and software: it can be virtualised, isolated and the migration tested on a copy.

Let’s prepare your migration

Describe your current servers and your destination. We will propose a method, a schedule and a rollback plan.

Sources

Sources consulted on 17 October 2026. Supplier prices are shown excluding tax, in the currency and region of the published price list, and may change: always check the official page before deciding.

  1. StandICT – ISO/IEC 17203:2017, Open Virtualization Format (OVF) — www.standict.eu/standards-repository/standard/information-technology-open-virtualization-format-ovf-specification-0
  2. Proxmox – Proxmox VE 8.2 press release (24 April 2024) — proxmox.com/en/about/company-details/press-releases/proxmox-virtual-environment-8-2
  3. AWS data transfer pricing survey, checked in June 2026 — egresscost.com/aws/data-transfer-pricing
  4. AWS – Free data transfer out to internet when moving out of AWS (5 March 2024) — aws-news.com/article/2024-03-05-free-data-transfer-out-to-internet-when-moving-out-of-aws
  5. WZ-IT – Data Act: Articles 25, 29 and 34 on switching providers — wz-it.com/en/blog/data-act-switching-charges-2027/
  6. Regulation (EU) 2023/2854 (Data Act) – EUR-Lex — eur-lex.europa.eu/eli/reg/2023/2854/oj
  7. Regulation (EU) 2016/679 (GDPR), Chapter V – EUR-Lex — eur-lex.europa.eu/eli/reg/2016/679/oj

Backup and restoration are operated by WeDoBack.